2021
We have completed the project to supply AWS (Automatic Weather Stations) for 45 locations for the Pakistan Meteorological Department. In addition, we have provided a host computer system to receive and process the data, and Meteorological Calibration Equipment.
-
2019
Project completed for supply and installation of a Dual 400kVA Generator with main switchboard for critical systems in Faleolo International Airport.
-
2019
Delairco was awarded the project for the supply and installation of the Himawari 8 Satellite Data Receiving System in Brunei Darussalam.
This project was a full turnkey solution including system design, installation and training.
-
The project has been completed.
-
2017
In cooperation with the construction of the Mauritius Meteorological Bureau radar building, we have delivered a backup system including a power engine generator.
-
2016
Delairco was awarded the project for the supply and installation of the Himawari 8 Satellite Data Receiving System in Sri Lanka.
This project was a full turnkey solution including system design, installation and training.
-
2017
The project has been completed.
-
2016
We received the order for power backup system including large and small photovoltaic hybrid power generation systems with dual diesel generators and power conditioning equipment at for Pakistan Islamabad, Multan and remote site sites.
-
2017
The installation of the solar array on the roof of the Pakistan Meteorological Department in Islamabad was completed.
-
2020
The project has been completed.
-
2015
Delairco was awarded the project for the supply and installation of 3 Himawari 8 Satellite Data Receiving Systems for Fiji, Solomon Islands and Vanuatu.
-
2016
The project has been completed.
-
2015
Delairco was awarded a project for the improvement of meteorological and hydrological equipment in the Lao People’s Republic. The project included 18 Automatic Weather Stations, 8 Hydrological Stations, Communication systems, Weather data management and storage computers, a Himawari 8 satellite receiving system, GTS message switch, World Information System (WIS), and power backup system with dual generators, ATS and power conditioning system. The project was completed on a full turnkey basis including supply, installation, and Client training.
-
2016
This project was successfully completed on schedule in April.
-
2014
Delairco was awarded the project to supply 30 Automatic Weather Stations (AWS), GSM Communication System and Receiving and Data Processing Computers to the Myanmar Department of Hydrology and Meteorology.
This project was a full turnkey project including supply, installation, and User training.
-
2016
The project was successfully completed in May.
-
2014
Delairco was awarded the project to supply 3 solar hybrid power systems to provide continuous power to VSAT satellite communication systems in Myanmar. These systems provide at least 7 days continuous power in the event of mains AC power failure and no sunshine conditions.
This project was a full turnkey project including supply, installation, and User training.
-
2017
The project was completed.
-
2014
Delairco was awarded the project to supply 3 solar hybrid power systems to provide continuous power to VSAT satellite communication systems in the Philippines. These systems provide at least 7 days continuous power in the event of mains AC power failure and no sunshine conditions.
This project was a full turnkey project including supply, installation, and User training.
-
2015
The project was completed.
-
2013
The project was awarded for the supply of 5 weather station and data receiving system for the Lesotho Met Office. This project included installation and client training.
-
2013
The project was completed.